I have 2 events conflicting but as far as I can tell they shouldn't.

If I separate the events by an additional 15 mins they stop conflicting.

I have no recovery time on the unit both events have

Comments (8)

photo
1

It looks like the travel end time for lead 64482471 is at 9:15am and the travel start time for lead 63961337 is also at 9:15am.

This is creating a tight turnaround and why it is showing as a conflict.

f96f27152f3fe634fda2ab9f2286869a

photo
1

I had it manually spaced on the delivery planner to show a tight turn around, but when I put the all together they conflict.

I've adjusted it to show you what I mean if you want to look again, thanks!

photo
1

The travel is straight from one event to the next

photo
1

I would recommend spacing them out to show the tight turnaround. Now as you have it, the travel start time for 63961337 is 9am and the travel end time for 64482471 is 9:15am. These times are now overlapping.

photo
1

Got it, I manually changed 64482471 drive time to .5 hours and it made it not conflict on the route. Never had one do that so I was confused! lol

Thanks!

photo
1

NVM it's still being difficult. I don't want to manually space them an extra 15mins that I don't need because that'll throw all the time after off.

photo
1

Got it, sorry bout all that!