This object is in archive! 
Delivery Time needed
Answered
I just entered an event today and when I looked at the Contract information tab, the delivery time was set to 0
I adjusted it to .30 but I have no idea why it set to 0.
Lead Id: 1297676
It looks like an error in the mapping service we used when the lead was generated.
It looks like an error in the mapping service we used when the lead was generated.
Ok thanks..
I assume that means there is or will be a fix?
Ok thanks..
I assume that means there is or will be a fix?
I've added a note in our product development system to handle this better: perhaps as a warning flag if it returns a zero. But we can't exactly garuantee Google/mapquest will not ever error when we send a call to them for travel time.
I've added a note in our product development system to handle this better: perhaps as a warning flag if it returns a zero. But we can't exactly garuantee Google/mapquest will not ever error when we send a call to them for travel time.
Yea i like the idea if it is a zero time to give us a warning or something.
Like maybe when we are putting in delivery/return dates and times and go to save give us the same type lock message we get if we leave it out or the times dont match etc.
I think that would work..
That might not be to hard to implement since that type of code is already in place, just check a different field for info..
Thanks
Yea i like the idea if it is a zero time to give us a warning or something.
Like maybe when we are putting in delivery/return dates and times and go to save give us the same type lock message we get if we leave it out or the times dont match etc.
I think that would work..
That might not be to hard to implement since that type of code is already in place, just check a different field for info..
Thanks
Replies have been locked on this page!